Symptom
Solicitation total cost and cost/piece is not being calculated when the cost and date fields are added to the solicitation in the lookup table.
Cause
The issue has been confirmed as a product defect and has been reported to our Research and Development team.
Resolution
Please refer to KB article 4771-Scheduled fixes to see if this is scheduled for a fix.
Additional Information
On-line help:
Solicitations Layout
Solicitations Layout
Field Name Field Label |
Lookup Table | Type Length [Default] |
Description |
sol_cost Cost per piece |
none | money |
This field represents the cost per piece for this solicitation. It is generated by the system and is the sol_tlcost (total cost) divided by the sol_pieces (number of pieces). |
sol_tlcost Total Cost |
none | money |
This field represents the total cost associated with this solicitation. This field is generated by the system and is the sum of the sol_print, sol_other, and sol_postge columns. |
Article Type
Product Defect
Product Line
Millennium
Product Module/Feature
Table Maintenance
Product Version
2013.5
Database Engine
Oracle
Ranking